Company  |  Plant Engineering  |  High Pressure Technology  |  Rotary Valve  |  News  |  Info  |  Contact
 
UP TO DATE
PLANT ENGINEERING
   › Cavity Filling
   › 
      › 
         › Container System
         › 
         › speedmaxx
      › mobile hydraulic


OverviewstreamMaxx basestreamMaxx transstreamMaxx ssg

Overview of optimal applications

  base trans ssg
Tunnel construction  x x x
Concrete repair x    
Shaft construction x    
Slope stabilisation x x  
Portal stabilisation x x x
       

Overview of features

  base trans ssg
Kiln-dried material x x x
Earth-moist material     x
Mobile x x  
Stationary x x  
Metered delivery x x x
Higher delivery for longer conveying distances   x x
Pneumatic charging from supplying bulk transporter  x x  
Charging from tower silo   x x
Absolutely non-segregating delivery   x  

Ugol Rossii & Mining 2010

17th International Trade Fair for Mining Technology
Exploration, Underground Mining, Open-Cast-Mining, Mineral Processing and Coal Preparation
June 1-4, 2010
Novokuznetsk / Russia

Booth 2.A41

 

International Fair of Mining, Power Generation and Metallurgy
Katowice, Poland
September 1-4, 2009

Pittsburgh, Pensylvania
June 16-18, 2009